Second day of work

On the second day, we mostly just grinded the edges on the steel base pieces for wood cutter cranes, got some frozen brass rings, which were in the freezer overnight. I’m pretty sure using it as a regular freezer would be a bad idea since it goes down to -85 degrees in there.  After the brass rings froze they shrunk up just enough to fit into the steel pieces, so it was possible to assemble them together. We also grinded and assembled smaller metal pieces, which are used to make carbeds. Afterwards, we just planned what we will do the next day.

Oglejte si tudi