We were grinding away the waste flake of metal pieces a part of a wind turbine. We then lifted a lot of parts one by one and put in the bushing parts that were cooled on -86 degrees so they shrink and the parts were first washed with hot water in a water machine. We picked up the bushing parts with gloves and hold it in the bushing place so the warmed up and stayed inside. When the parts were finished we started packing them in europallets. We wraped the parts polyvinyl and taped it the last thing was to close the pallet.